PRODUCT DETAILS
The steam passing out from separating calorimeter may still contain some
water vapour , in it . in other words it may not be absolutely dry .
again , in a throttling calorimeter steam after passing through the
throttle valve must be superheated or at least dry saturated . this
limits the extent of dryness fraction that can be reliably measured ,
depend up on the pressure of steam in the main steam pipe . if a sample
of steam, which may be still wet after passing through the throttle
valve i.e it will not be superheated . thus under this condition the
throttling calorimeter fails to enable us in determining the value of
dryness fraction of steam . to overcome this difficulties we make use of
separating and throttling calorimeter . first the steam is passed
through separating calorimeter where itlosses most of it’s moisture and
becomes comparatively drier, it is than passed through the throttling
calorimeter where super heating takes place with out changr of total
heat . the temperature and pressure of steam after throttling are
measured by using a thermometer and manometer respectively.
DESCRIPTION
The set up consist of a separating and throttling calorimeter . a steam
generator is provided at the base of the apparatus . a thermostat knob
is provided at the front of apparatus to control the temperature inside
the steam generator . steam from steam generator is passed from
separating calorimeter where most of the water partical get separated
from steam and then passed to throttling calorimeter where steam get
superheated . after that superheated steam passed through heat exchanger
to condense the steam.
SAPARATING CALORIMETER
It consist of two concentric chamber , the inner chamber ,and the outer
chamber . which communicates with each other through an opening at the
top. As the steam discharge through the metal baskets ,which has a large
number of holes , the water partical due to there heavier momentum get
separated from the steam and collected in the chamber. The comparatively
dry steam in the inner chamber moves up and than down aging through the
annular space between the two chambers and enters the throttling
calorimeter .
THROTTLING CALORIMETER
It consist a narrow throat . pressure and temperature are measured by
manometer and thermometer . the steam after throttling process passed
through the heat exchanger and condensate is collected .
UTILITIES REQURIED
1.WATER SUPPLY 3 lit/min (approx)
2.Drain
3.Electric supply : 1phase , 220 V A.C , 2Amp.
4.Steam table for calculation
5.Space required : 1.0 m X 1.0 m
Bulk discounts on tender quantities for ITIs and polytechnics.
Approved vendor for MOE, World Bank and AfDB-funded projects.
On-site commissioning and operator training for turnkey supply.
Shipped to 60+ countries on FOB / CIF / DDP terms.
ELAB Engineering is one of India's leading manufacturers, exporters and authorised suppliers of Separating & Throttling Calorimeter With Boiler, supplying engineering laboratories, polytechnics, ITIs, university departments and Ministry of Education programmes for over twenty-five years. Each unit ships with the complete tender-grade documentation pack — ISO 9001 quality certificate, CE conformity declaration, RoHS compliance statement, country-of-origin certificate and authorised dealer letter — included as standard, not as an extra.
We supply Separating & Throttling Calorimeter With Boiler against Government of India e-procurement tenders (GeM, CPPP, e-Procurement portals of state DTEs and DGT), bilateral and multilateral donor-funded contracts (World Bank STEP, AfDB e-procurement, JICA, KfW, USAID), Ministry of Education and Ministry of Skill Development bulk procurement programmes, polytechnic and ITI modernisation schemes, university research grants, AICTE-MODROBS / RPS / MARGDARSHAN funded laboratory upgrades, NSQF-aligned skills development centre projects, and direct commercial procurements by engineering colleges and TVET institutions.
Our standard tender supply scope for Separating & Throttling Calorimeter With Boiler covers manufacturing to specification, factory acceptance testing, pre-shipment inspection (SGS / Bureau Veritas / Intertek where required by the tender), export-grade marine packaging, FOB / CIF / DDP shipping at the buyer's preference, marine insurance, destination customs clearance liaison, inland transportation to the institution's site, on-site installation by qualified service engineers, commissioning with the institution's faculty, hands-on operator training and a written handover with a 12-month manufacturing-defect warranty.
Our Separating & Throttling Calorimeter With Boiler is currently in service across more than sixty countries. The most common buyer profiles are: Ministry of Education (MOE) and Ministry of Skill Development teams running national TVET strengthening programmes; donor-funded project implementation units — World Bank STEP, AfDB skills programmes, EU technical co-operation; engineering colleges procuring laboratory equipment for AICTE-mandated curriculum modules; polytechnic institutes equipping diploma-level workshops; ITIs modernising trade-specific labs under DGT and state DTEs; private engineering universities with NAAC-accreditation laboratory requirements; vocational training centres aligned to NSQF skill levels 4–7; and corporate skill-development partners running CSR-funded technical training.
Manufacturer-direct pricing applies on tender-scale quantities of Separating & Throttling Calorimeter With Boiler. Volume pricing tiers are extended at 10+ unit, 25+ unit and 50+ unit thresholds, with bespoke pricing on consignments above 100 units. On donor-funded procurements we provide separate price ladders for FOB Mumbai, CIF destination port and DDP institution gate as requested. Indicative landed cost calculations — including freight, marine insurance, destination customs and inland delivery — are shared with every formal quotation so the procurement evaluator can compare bids on a like-for-like total cost basis.
Standard ex-works lead time for Separating & Throttling Calorimeter With Boiler is two to three weeks for stock configurations and four to six weeks for customised configurations (voltage / frequency variants, specification customisations, language localisation, sponsoring-agency branding overlays). Sea-freight transit adds a further three to six weeks depending on destination port. We accept Letter of Credit (sight LC, 30/60/90-day usance LC), RTGS / NEFT for domestic supply, and milestone-based payments structured against tender progress for turnkey contracts. Standard warranty is twelve months from the date of installation against manufacturing defects, with optional Annual Maintenance Contract (AMC) renewals covering preventive maintenance, calibration, replacement of consumables and remote technical support.
The most common reason a tender bid for engineering laboratory equipment is rejected is not price — it is documentation. A missing certificate, a country-of-origin that does not match, a sample that fails on a single specification, or an authorised dealer letter not on the manufacturer's letterhead. As experienced Engineering Lab Equipment Suppliers and Skill Training TVET Lab Equipment Manufacturers for bulk Tender supply, we treat the documentation pack as a first-class deliverable. Our tender desk maintains a pre-built compliance library matched to World Bank STEP, AfDB e-procurement, GeM and bilateral donor templates — so the documentation is the easiest part of the bid, not the hardest.
Beyond paperwork, the discipline of factory acceptance testing before shipment, marine-grade export packaging, and on-site commissioning by our own service engineers (rather than freight-forwarder hand-offs) means the equipment that arrives at the institution is the equipment that was tendered for — with no surprises at uncrating. This consistency is why we are repeatedly shortlisted for repeat orders by institutions and donor agencies on subsequent tender rounds.
Email your tender document, Bill of Quantities or simple specification list to orders@elabengineering.com or call +91-9811375383. Our tender desk responds within forty-eight hours with itemised pricing, the certifications matrix, country-of-origin and shipping options bundled into a single proposal — in the format your evaluation committee expects.
Curriculum-aligned use cases for engineering colleges, polytechnics, ITIs and TVET training centres.
Aligned to AICTE / UGC engineering syllabus modules, covering both theory demonstration and practical experimentation outcomes.
Mapped to NSQF polytechnic and ITI diploma practical schedules — designed for hands-on student experimentation, not just demonstration.
Configured for competency-based assessment with clear pass/fail criteria — ready for direct deployment in skill-development programmes.
The complete documentation stack a procurement evaluator expects to find in the box — standard, not extras.
ISO 9001, ISO 14001, CE and RoHS declarations
Country-of-origin certificate & authorised dealer letter
NABL / ISO 17025 traceable calibration certificates
Operating manuals, lab worksheets & safety instructions
Manufacturing-defect warranty with optional AMC extension
FOB / CIF / DDP terms with customs & insurance handling
On-site installation & commissioning by qualified engineers
Hands-on operator training & lab manual handover
When specifying Separating & Throttling Calorimeter With Boiler for an engineering college, polytechnic or TVET institution, the procurement officer's checklist looks slightly different to the lecturer's wishlist. The lecturer wants the equipment that demonstrates the principle most clearly. The procurement officer wants the equipment that survives evaluation, customs, installation and the first year of student use.
As experienced Engineering Lab Equipment Suppliers we treat both audiences as customers. The technical specification needs to satisfy the academic requirement — but the documentation, packaging, freight and warranty pack also need to satisfy the auditor. Both happen on the same shipment.
For Skill Training TVET Lab Equipment Manufacturers for bulk Tender supply, the additional layer is donor compliance: World Bank STEP procedures, AfDB e-procurement standards, and bilateral donor templates each have specific certification expectations. Our tender desk maintains a pre-built compliance library matched to these formats.
Get manufacturer-direct pricing, technical datasheets and shipping schedules within 24 hours.
Request Bulk Quote